Building process and Timeline |
|
 |
Efficient Construction Timeline The initial phases, such as project design or selection and land inspection, depend on client choices. Once defined and the contract is signed, the construction follows a clear and realistic schedule. A team of about 60 professionals, including engineers and skilled workers, manages each stage—from site preparation to assembly and finishing—ensuring efficiency and high-quality results. |
|
 |
|
 |
Working months, excluding unforeseeable events. |
|
 |
|
 |
1 Architectural and Engineering Project
2 Factory Preparation of the structures 3 On-site transport and assembly
4 Installation of systems and coverings
|
|
 |
|
 |
1. Architectural and Engineering Project Bring your architectural project, work with our in-house architects or choose one of our prefab and modular house model.
In this phase we will calculate the complete process estimation, based on all your choise. Our engineer will create the 3D structural project for the factory preparation.
|
|
|
 |
2. Factory Preparation of Walls, Beams and Pillars In the off-site factory we proceed with the production of the elements that will make up the building. The construction phase of the structures takes place quickly, with the utmost precision thanks to the use of high quality machine and skilled worker. |
|
|
 |
3. Transport and assembly of the structure on-site We transport in the building site all the prefab elements for the structure assembly. The assembly process is quick and fast and can be made by a small team of specialized worker. The building site will stay clean without the usual situation due to the traditional beton work. |
|
|
 |
4. Installation of systems and external and internal coverings Thanks to the maximum precision of the components, the installation of systems and external-internal coverings are quick, simple and fast. Tha choosing of high quality and personalized materials will give the right standard that every client want. |
|
|
 |
Our construction system allows you to obtain any type of structure by producing all the elements necessary for its construction. The design phase makes use of the most advanced 3D design and structural calculation software, which allow us to tackle any type of project. First the architectural idea is developed in detail on the basis of the technical specifications, then thanks to the three dimensional visualization, the image of the structure and of each component is provided, allowing for any corrections or modifications. Finally, all the information is transfered to our workshop which proceed with the production of the elements that will make up the building. The construction phase of the structures takes place quickly, with the utmost precision thanks to the use of high quality elements free from any type of imperfection. Thanks to the lightness and maximum precision of the components, the system allows a considerable reduction in production and construction costs, since transport and assembly are quick, simple and fast.
|
|
 |
|
 |